Restaurant, retail, and office build-outs across Delray Beach — from Atlantic Avenue and Pineapple Grove to the surrounding commercial districts — with the design-review and permitting path handled by one licensed team.
From Atlantic Avenue storefronts and Pineapple Grove to the downtown core, Delray commercial work often means coordinating design review alongside the building permit. We build to the city's standards and manage both tracks so they don't hold each other up.
From lease evaluation to certificate of occupancy — one licensed team accountable for the entire build.
A sample of Keystone commercial build-outs across South Florida. [ Swap in Delray Beach projects as they complete. ]
Keystone is a Florida Certified General Contractor (CGC1541355) that manages commercial build-outs and tenant improvements from evaluation and permitting through final inspection — one accountable team, not a broker handing your project to whoever is cheapest that week.
Delray Beach runs a fully digital permit process, and many commercial projects also pass through design review. We manage the whole path — plan review, the appearance board, and historic approvals where they apply.
Delray reviews building permits through its ePlans / eServices portal — paper plans are no longer accepted. We prepare and submit the digital package and manage it to issuance.
Substantial commercial exterior work — facades, signage, site changes — can require SPRAB design review. We identify whether your scope triggers it and prepare the submittal.
Projects on or near Atlantic Avenue's historic districts can require Historic Preservation Board approval. We flag that early so it's built into the timeline, not discovered late.
VERIFY: current figures put commercial initial review around 10-30 business days and tenant improvements around 10-20, with correction cycles of roughly 5-10 business days each. We answer comments directly to keep them short.
A change of occupancy and the separate electrical, plumbing, mechanical, and fire-sprinkler permits are mapped up front so nothing stalls the build.
Tell us the space and your target opening. We'll give you a straight read on scope, the Boca permitting path, and next steps — no obligation.
We reply within one business day.
Tell us about the space and your target opening date. We'll walk through the build and the Delray Beach permitting path before you're committed.