Restaurant, retail, and office build-outs across Boynton Beach — from the downtown and Town Square area to the Congress Avenue corridor — permitted and delivered by one licensed team.
From the downtown redevelopment area to the Congress Avenue commercial corridor, we build Boynton commercial interiors to the city's standards and, in the CRA district, coordinate the design guidelines — and the grant programs — that come with it.
From lease evaluation to certificate of occupancy — one licensed team accountable for the entire build.
A sample of Keystone commercial build-outs across South Florida. [ Swap in Boynton Beach projects as they complete. ]
Keystone is a Florida Certified General Contractor (CGC1541355) that manages commercial build-outs and tenant improvements from evaluation and permitting through final inspection — one accountable team, not a broker handing your project to whoever is cheapest that week.
Boynton Beach runs a paperless permit process through its SagesGov portal. We prepare a fully coordinated submittal — the most reliable way to avoid repeat review cycles here.
Applications, plan review, issuance, inspections, and closeout all run through the city's SagesGov portal. Files must be unprotected, signed-and-sealed PDFs — we prepare them correctly the first time so nothing bounces on intake.
The common first-review comments here are missing fire-sprinkler drawings, incomplete structural calcs, ADA restroom and route issues, and MEP coordination gaps. We submit all trades coordinated together to avoid the extra cycles.
In the downtown CRA district, facade, signage, and landscaping fall under design guidelines that may need review — and the CRA offers facade and improvement grants. We handle the review and flag incentives you can use.
VERIFY: a tenant improvement with limited MEP scope often runs about 4-6 weeks for initial review, with correction cycles on top. A complete first submittal is the way to keep it moving.
A change of occupancy and the separate electrical, plumbing, mechanical, and fire-sprinkler permits are mapped up front so nothing stalls the build.
Tell us the space and your target opening. We'll give you a straight read on scope, the Boca permitting path, and next steps — no obligation.
We reply within one business day.
Tell us about the space and your target opening date. We'll walk through the build and the Boynton Beach permitting path before you're committed.